In a system
of 4 SPP pumps, taking measurement for flow and efficiency
identified that three were operating at such a reduced level
that overhaul was viable on the grounds of improving efficiency.
The pumps were new in 1970 and apart from minor maintenance
had not been overhauled since installed.

Levern
was selected to carry out the removal, overhaul, re-installation
and re-commissioning and Arc was specified as the efficiency
coating system. The work was carried out during 2001.
Post overhaul
tests showed that the pumps were now more efficient with a
greater flow rate than when new.
|